PILING & SUBSTRUCTURE

We are market leaders in the installation of piled substructures for commercial and non-commercial buildings and specialise in the installation of precast or prestressed concrete and steel pipe piles to any required depth.

marine piling
56 precast steel reinforced slabs and forms were constructed on-shore

BVI Cruise Pier Expansion

Fourteen pile caps were constructed on top of groups of six 36” piles. 56 precast steel reinforced slabs and forms were constructed on-shore to make the deck topping; each was installed with barge and crane.

The mooring dolphins were constructed on a group of sixteen 48” piles. For each dolphin, 160 cubic yards of concrete was poured. During the pour process, a procession of concrete trucks were ferried out to sea on a roll-on, roll-off barge and a boom concrete pump used to fill the pile caps.

6-storey office and retail building

Wheatley Building

35,355 square foot 6-storey office and retail building in the heart of Road Town

6-storey office and retail building

Wheatley Building

35,355 square foot 6-storey office and retail building in the heart of Road Town

300′ long by 38′ wide pile supported extension

Heritage Cruise Pier Antigua

The pier modifications consisted of constructing a 300′ long by 38′ wide pile supported extension at the west end of the pier. In addition, mooring and fender blocks were installed on the north side of the extension and existing pier. Mooring dolphins and access catwalks were also constructed.

heritage quay pier antigua sq