CIVIL ENGINEERING
![pockwood-pond-power-station-expansion-10 pockwood-pond-power-station-expansion-10](https://meridianbvi.com/wp-content/uploads/bb-plugin/cache/pockwood-pond-power-station-expansion-10-square.jpg)
Pockwood Pond Power Station Extension
Meridian Construction was the civil contractor on the Phase 5 expansion. Meridian built all the structural elements which included excavating into the hill and removing 25,000 m3 of soil and rock; concrete foundations for engines, exhaust stacks, fuel tanks and transformers: structural steel control rooms an engine hall. The work also included the fitting out and infrastructure.