CIVIL ENGINEERING
Pockwood Pond Power Station Extension
Meridian Construction was the civil contractor on the Phase 5 expansion. Meridian built all the structural elements which included excavating into the hill and removing 25,000 m3 of soil and rock; concrete foundations for engines, exhaust stacks, fuel tanks and transformers: structural steel control rooms an engine hall. The work also included the fitting out and infrastructure.