Meridian Construction was the civil contractor on the Phase 5 expansion. Meridian built all the structural elements which included the excavating into the hill and removing 25,000 m3 of soil and rock; drainage; concrete foundations for engines, exhaust stacks, fuel tanks and transformers: structural steel control rooms and engine hall. The work also includes the fitting out and infrastructure. The project was delivered in late 2016.