Meridian logo

A MAJOR CARIBBEAN CONSTRUCTION COMPANY

As Featured....

In PILEBUCK, the premiere source for deep foundations and marine construction, as well as pile driving, foundation drilling, geotechnical engineering

pilebuck

MARINE CONSTRUCTION

Using our engineered precast concrete dock systems in the construction of docks, marinas and bulkheads, we manufacture our own templates, precast piles, caps and slabs for a precision fit for any marine structure

LATEST NEWS

83-Pile Commercial Building Project Completed

June 9, 2020

Meridian just completed the piling for a new 6-storey office and retail building in the heart of Road Town.

Meridian drove 83 piles to a depth of 55 feet to support the 4,980 ton, 35,355 square foot building.

Nanny Cay Inner Marina Piling Completed

October 14, 2019

Using our barge, tug, support vessels, 230-tonne crane and an APE vibro hammer we piled 123 new piles for Nanny Cay’s new docks in the inner marina

Oil Nut Bay Marina Village Completed

April 30, 2019

The Marina Village and Nova Restaurant for day guests and overnighting yachts is set to become the new hub of Virgin Gorda. The new addition to the residential resort in the North Sound, Virgin Gorda includes a new waterfront restaurant and bar, a market, deli and provisioning store, a boutique and a library. Meridian’ work on this project included piling and…

83-Pile Commercial Building Project Completed

June 9, 2020

Meridian just completed the piling for a new 6-storey office and retail building in the heart of Road Town.

Meridian drove 83 piles to a depth of 55 feet to support the 4,980 ton, 35,355 square foot building.

Nanny Cay Inner Marina Piling Completed

October 14, 2019

Using our barge, tug, support vessels, 230-tonne crane and an APE vibro hammer we piled 123 new piles for Nanny Cay’s new docks in the inner marina

Meridian Plays Key Role In Installation Of Sewage Infrastructure – Part Two

April 29, 2016

Installation of Sewage Treatment Pump Station. Meridian was contracted by Biwater International to construct the pump station and install the pumps. This work was technically difficult as the pump station, located at a depth of 25’, is situated on reclaimed land and below the water table. Additionally the subsurface is running, waterlogged sand. This meant that no ordinary excavation could be conducted and required Meridian to devise a method to construct and install these 15-ft diameter, reinforced concrete tanks.

MOBILIZATION & DEMOBILIZATION

A major upfront expense of any project.  Meridian carefully manages its mobilization and demobilization plans.  We source the skilled workforce and ensure that all requisite plant, equipment and materials are on site at the start of the project and removed on completion.

BVI CRUISE PIER EXPANSION

Meridian was contracted by the Government of the Virgin Islands through the BVI Ports Authority to undertake the marine construction and dredging for the Cruise Pier Expansion project.

DREDGING & RECLAMATION

We have undertaken ocean dredging, land reclamation as well as landside excavations and landfill projects adhering to environmental guidelines to minimize adverse impacts.

HERITAGE QUAY CRUISE PIER ANTIGUA

Meridian Construction Ltd was the Caribbean marine contractor engaged by the St. John’s Development Corporation Heritage Quay, Antigua